Project: Establishing the physical condition of the inner stack, implementing control radiological measurements, and analysis of materials from the body of the inner, work tube of the stack for the presence of NORM radionuclides and asbestos for purposes of estimating the condition of the (work) ambient in the interspace of the stack during the operation of the Plomin Thermal Power Plant (CROSBI ID 785889)

Druge vrste radova | elaborat/studija

Prlić, Ivica ; Kugić, Mirsad ; Hajdinjak, Mladen ; Cerovac, Zdravko ; Davila, Silvije ; Šiško, Jerko Project: Establishing the physical condition of the inner stack, implementing control radiological measurements, and analysis of materials from the body of the inner, work tube of the stack for the presence of NORM radionuclides and asbestos for purposes // 2014. 2014.

Podaci o odgovornosti

Prlić, Ivica ; Kugić, Mirsad ; Hajdinjak, Mladen ; Cerovac, Zdravko ; Davila, Silvije ; Šiško, Jerko

engleski

Project: Establishing the physical condition of the inner stack, implementing control radiological measurements, and analysis of materials from the body of the inner, work tube of the stack for the presence of NORM radionuclides and asbestos for purposes of estimating the condition of the (work) ambient in the interspace of the stack during the operation of the Plomin Thermal Power Plant

The Project Task was to test the ambient conditions between the inner/work tube and the outer surface/bearer of the stack during the operation of Plomin TPP and measure radioactivity and asbestos in samples from the work/inner tube of the stack. This was done with the aim to categorise and handle potentially hazardous and/or unhazardous construction waste formed during planned future construction works at the said location.

Coal Power Pant, NORM, stack, radiological risk analysis

The Final Report of the Project „Establishing the physical condition of the inner stack, implementing control radiological measurements, and analysis of materials from the body of the inner, work tube of the stack for the presence of NORM radionuclides and asbestos for purposes of estimating the condition of the (work) ambient in the interspace of the stack during the operation of the Plomin Thermal Power Plant“ comprises: Report on ambient conditions and recommendations for future work in the stack from 22 (24) September 2014, Results of laboratory analyses on samples of material from the stack for radioactivity, Estimations and calculations of material volumes from the inside of the stack, and Final Report and, pursuant to the Contract, must in no way and under no conditions be presented individually, interpreted, partially copied or published without prior consent from the owner (Client) and approval from the Contractor (IMROH). For purposes of the stated Project – services, on 12 September 2014 Contract IMROH-EKONERG: Reg.no. was signed.

nije evidentirano

nije evidentirano

nije evidentirano

nije evidentirano

nije evidentirano

Podaci o izdanju

2014

2014.

nije evidentirano

objavljeno

Povezanost rada

nije evidentirano