Rehabilitation of the bridge Ivanja Reka over the river Sava (CROSBI ID 518857)
Prilog sa skupa u zborniku | izvorni znanstveni rad | međunarodna recenzija
Podaci o odgovornosti
Vlašić, Anđelko ; Mujkanović, Nijaz ; Radić, Jure
engleski
Rehabilitation of the bridge Ivanja Reka over the river Sava
In 1981 bridge Ivanja Reka over the river Sava was finished. It has been operational for only 20 years since then before first signs of deterioration appeared. This was due to poor and unconscious erection process of mostly prefabricated elements which allowed for water percolation in combination with winter road salting and as a result reinforcement corrosion and concrete cracking. Research work was done to determine the extent of the damage and soon after the rehabilitation project was made. It included the removal and replacement of the deteriorated upper parts of the superstructure, which were the leveling concrete, transverse concrete joint and some of the prefabricated slabs, together with corroded reinforcement, and the replacement of the complete cantilever slab with the pedestrian way. The concrete removal was done with ConJet Robot equipment using high pressure hydro-demolition machinery. The rehabilitation is up to this date nearly finished and this paper will give an insight in the way the work was done.
rehabilitation; concrete; reinforcement; hydro-demolition; deterioration;
nije evidentirano
nije evidentirano
nije evidentirano
nije evidentirano
nije evidentirano
nije evidentirano
Podaci o prilogu
885-898-x.
2006.
objavljeno
Podaci o matičnoj publikaciji
Bridges
Radić, Jure
Zagreb: SECON HDGK
Podaci o skupu
International Conference on Bridges
predavanje
01.01.2006-01.01.2006
Dubrovnik, Hrvatska