DESIGN OF MAINLAND – PELJESAC BRIDGE (CROSBI ID 523282)

Prilog sa skupa u zborniku | izvorni znanstveni rad | međunarodna recenzija

Radić, Jure ; Šavor, Zlatko ; Hrelja, Gordana DESIGN OF MAINLAND – PELJESAC BRIDGE // International Conference on BRIDGE ENGINEERING - Challenges in the 21th Century, PROCEEDINGS / Cheung Tsz King (ur.). Hong Kong: Civil Devision, The Hong Kong Institution of Engineers, 2006. str. 1-8-x

Podaci o odgovornosti

Radić, Jure ; Šavor, Zlatko ; Hrelja, Gordana

engleski

DESIGN OF MAINLAND – PELJESAC BRIDGE

The southern part of Croatia, including the city of Dubrovnik, is currently separated from the rest of Croatia by a small coastal stretch belonging to the state of Bosnia and Herzegovina. The new bridge crossing the sea strait between the Croatian mainland and the Peljesac peninsula shall provide the fixed road link between the whole of Croatia and also further the development of the Pelješac peninsula and adjacent islands. Extensive offshore site investigations were carried out, including continuous shear wave survey and geotechnical explorations from a specially equipped drill ship, to obtain soil parameters for the design of bridge foundations. A site-specific seismic study was undertaken based on the seismic source zone characterization and attenuation relationships for the south of Croatia. Over 10 bridge types, including beams, trusses, arches and cable-stayed bridges, were studied at the preliminary stage and two of them were short listed. The short listed types comprised a beam and a cable-stayed bridge. The winning solution chosen for the main design was a continuous steel box type superstructure bridge of uniform depth, supported by concrete piers and abutments on deep tubular steel driven piles foundations.

design; steel bridge; soil parameters; seismicity; deep foundations

nije evidentirano

nije evidentirano

nije evidentirano

nije evidentirano

nije evidentirano

nije evidentirano

Podaci o prilogu

1-8-x.

2006.

objavljeno

Podaci o matičnoj publikaciji

International Conference on BRIDGE ENGINEERING - Challenges in the 21th Century, PROCEEDINGS

Cheung Tsz King

Hong Kong: Civil Devision, The Hong Kong Institution of Engineers

Podaci o skupu

International Conference on Bridge Engineering - Challenges in the 21th Century

predavanje

01.11.2006-03.11.2006

Hong Kong, Kina

Povezanost rada

Građevinarstvo