Nalazite se na CroRIS probnoj okolini. Ovdje evidentirani podaci neće biti pohranjeni u Informacijskom sustavu znanosti RH. Ako je ovo greška, CroRIS produkcijskoj okolini moguće je pristupi putem poveznice www.croris.hr
izvor podataka: crosbi

Finding the link between visual inspection and key performance indicators for road bridges (CROSBI ID 678872)

Prilog sa skupa u zborniku | izvorni znanstveni rad | međunarodna recenzija

Mandić Ivanković, Ana ; Kušter Marić, Marija ; Skokandić, Dominik ; Njirić, Ela ; Šiljeg, Josipa Finding the link between visual inspection and key performance indicators for road bridges // Proceedings of IABSE SYMPOSIUM "Towards a Resilient Built Environment" GUIMARÃES 2019. Zürich: International Association for Bridge and Structural Engineering (IABSE), 2019. str. 737-744

Podaci o odgovornosti

Mandić Ivanković, Ana ; Kušter Marić, Marija ; Skokandić, Dominik ; Njirić, Ela ; Šiljeg, Josipa

engleski

Finding the link between visual inspection and key performance indicators for road bridges

Based on the rating from visual inspection and proposed weighting through component, system and network level, assessment procedure resulting with set of six most important Key Performance Indicators (KPI) for road bridges is presented. Those are: bridge condition assessment, structural safety, traffic safety, durability indicator, availability and bridge importance in the network. KPIs organised in the radar shaped diagram serve for priority repair ranking decisions. The procedure is elaborated at the sample of five actual bridges: two reinforced concrete arch bridges, one with solid and other with hollowed cross- sections ; one frame type bridge with V shaped piers ; one precast slab overpass ; one solid slab continuous bridge with Y type piers. Bridges are built between 1958 and 2001 and are located either at the state or at the local roads in Croatia. Spans are varying from 9.5 to 72 m and overall lengths from 22 to 120 m.

bridge ; assessment ; damage ; component ; system ; network ; Performance Indicator ; Key Performance Indicator, priority repair ranking.

nije evidentirano

nije evidentirano

nije evidentirano

nije evidentirano

nije evidentirano

nije evidentirano

Podaci o prilogu

737-744.

2019.

objavljeno

Podaci o matičnoj publikaciji

Proceedings of IABSE SYMPOSIUM "Towards a Resilient Built Environment" GUIMARÃES 2019

Zürich: International Association for Bridge and Structural Engineering (IABSE)

978-3-85748-163-5

Podaci o skupu

IABSE SYMPOSIUM Towards a Resilient Built Environment (GUIMARÃES 2019)

predavanje

27.03.2019-29.03.2019

Guimarães, Portugal

Povezanost rada

Građevinarstvo