A reconstruction of previous and prediction of future consolidation of the Botonega dam (CROSBI ID 493578)

Prilog sa skupa u zborniku | izvorni znanstveni rad | međunarodna recenzija

Matešić, Leo ; Kvasnička, Predrag ; Vugrinec, Radovan A reconstruction of previous and prediction of future consolidation of the Botonega dam // Proc. of The 3rd international workshop on research on irrigation and drainage / Zvonimir Vukelić (ur.). Skopje: EurAgEng, 2003. str. 261-268-x

Podaci o odgovornosti

Matešić, Leo ; Kvasnička, Predrag ; Vugrinec, Radovan

engleski

A reconstruction of previous and prediction of future consolidation of the Botonega dam

During construction of the Botonega dam, instruments were installed to measure settlements of the dam foundation and embankment. Due to inadequate site preparation and improper instrument installation, the results of measurements obtained do not give a real picture of the behaviour of both the dam and the foundation. So far reliable data have been obtained only by geodetic measurements at 41 measuring points spread over 12 profiles. Regrettably, a zero measurement was made, i.e. the first geodetic measurements took place only five years after the start or two years following the completion of the dam construction. Thus no surveys were carried out of unloaded foundation or of the behaviour of the dam and foundation in the early stages of construction when most significant settlements occurred. In order to reconstruct previous consolidation processes and to predict the future ones, a numerical model was worked out. The sizes of the model and properties of materials used were determined based on the results of investigations, design and construction documents, as well as the results of annual monitoring, which included detailed data on the behaviour of the dam. Settlement values obtained by computing and geodetic measurements correspond well. However, in reality consolidation is faster than that calculated. This indicates that the coefficient of water permeability of the foundation determined in previous researches was too high. As for stress-strain characteristics of materials, at the time when the dam was designed, researches were not focused on determining elastoplastic properties of the materials because then no appropriate software was available.

dam settlement; clay; consolidation

nije evidentirano

nije evidentirano

nije evidentirano

nije evidentirano

nije evidentirano

nije evidentirano

Podaci o prilogu

261-268-x.

2003.

objavljeno

Podaci o matičnoj publikaciji

Proc. of The 3rd international workshop on research on irrigation and drainage

Zvonimir Vukelić

Skopje: EurAgEng

Podaci o skupu

The 3rd international workshop on research on irrigation and drainage

predavanje

19.03.2003-20.03.2003

Skopje, Sjeverna Makedonija

Povezanost rada

Građevinarstvo, Rudarstvo, nafta i geološko inženjerstvo