Projekt zaštite građevne jame za polaganje cjevovoda (CROSBI ID 338926)
Ocjenski rad | diplomski rad
Podaci o odgovornosti
Abramović, Nikica
Miščević, Predrag
hrvatski
Projekt zaštite građevne jame za polaganje cjevovoda
It is necessary to make the protection project for the foundation pit in order to construct the pipeline 0 1000 mm. It's necessary to find out all the forces whose are affecting on sheet pile ( in this case, on "I" beam ) and estimate it with satisfactory safety. Sheet pile dimensioned by Blumm method has been chosen on the basis of calculation as construction solution. We build interlocking pile with strut. The construtive pit is protected by partitionwall steel made elements "Larssen and Rombas" type.
geotehnika; rov; cjevovod; zaštita
nije evidentirano
engleski
Cofferdam for pipeline excavation
nije evidentirano
geotechnique; sheet piled excavation; pipe line; protection
nije evidentirano
Podaci o izdanju
92
14.11.2002.
obranjeno
Podaci o ustanovi koja je dodijelila akademski stupanj
Split