Use of a computerized tool (ORAM) to help manage outage safety and risk at NPP Krško (CROSBI ID 469095)

Prilog sa skupa u zborniku | stručni rad | međunarodna recenzija

Dagan, William J. ; Špiler, Jože ; Shanley, Leo B. ; Naum, Tom J. ; Bašić, Ivica ; Vrabanić, Ivan ; Fifnja, Igor ; Kaštelan, Marin Use of a computerized tool (ORAM) to help manage outage safety and risk at NPP Krško // Proceedings of the International Conference on Nuclear Option in Countries with Small and Medium Electricity Grids / Knapp, Vladimir ; Čavlina, Nikola (ur.). Zagreb: Hrvatsko nuklearno društvo, 1998. str. 323-330-x

Podaci o odgovornosti

Dagan, William J. ; Špiler, Jože ; Shanley, Leo B. ; Naum, Tom J. ; Bašić, Ivica ; Vrabanić, Ivan ; Fifnja, Igor ; Kaštelan, Marin

engleski

Use of a computerized tool (ORAM) to help manage outage safety and risk at NPP Krško

Outage Risk Assessment and Management (ORAM) is a computerized methodology developed by the U.S. Electric Power Research Institute (EPRI) to help Nuclear Power Plant personnel manage the risk and safety associated with refueling and forced plant outages. Today, over 60 plants including NPP Krško are using ORAM during the preparation and performance of plant outages. In fact, many plants are attributing much of the reductions in the duration of refueling outages to the use of ORAM. The success of the ORAM methodology is the capability to provide plant and management personnel with understandable results from both deterministic evaluations of plant safety and quantitative risk assessments. The Nuklearna Elektrarna Krško (NEK) use of ORAM involves both of these approaches. The deterministic portion of ORAM is used to model the NPP Krško Shutdown Technical Specifications and administrative considerations. The probabilistic portion of ORAM uses industry and NEK specific initiating events and other risk elements pertaining to shutdown to derive a quantitative risk assessment for various end states, including core damage and RCS boiling. The deterministic and probabilistic approaches to safety complement one another. This paper expands on the value of each approach and demonstrates the benefits of combining these elements in the decision-making process. Another key advantage of ORAM is the ability to apply the methodology to specific outages. Since no outage is identical, this provides tremendous benefits to plant personnel for managing the safety and risk of a particular outage. ORAM does this by organizing all of the various plant configurations and equipment unavailability windows into numerous plant states. Furthermore, ORAM evaluations can be "automated" by interfacing with outage scheduling software programs such as Primavera. For each plant state, the deterministic and the probabilistic logic evaluations are applied. This paper will demonstrate the ORAM evaluation for an actual NPP Krško outage

ORAM; nuclear power plant; safety risk; deterministic approach; probabilistic approach

nije evidentirano

nije evidentirano

nije evidentirano

nije evidentirano

nije evidentirano

nije evidentirano

Podaci o prilogu

323-330-x.

1998.

objavljeno

Podaci o matičnoj publikaciji

Proceedings of the International Conference on Nuclear Option in Countries with Small and Medium Electricity Grids

Knapp, Vladimir ; Čavlina, Nikola

Zagreb: Hrvatsko nuklearno društvo

Podaci o skupu

2nd International Conference on Nuclear Option in Countries with Small and Medium Electricity Grids

poster

15.06.1998-18.06.1998

Dubrovnik, Hrvatska