Nalazite se na CroRIS probnoj okolini. Ovdje evidentirani podaci neće biti pohranjeni u Informacijskom sustavu znanosti RH. Ako je ovo greška, CroRIS produkcijskoj okolini moguće je pristupi putem poveznice www.croris.hr
izvor podataka: crosbi

Risk estimation in the process of construction project calculation (CROSBI ID 525110)

Prilog sa skupa u zborniku | izvorni znanstveni rad | međunarodna recenzija

Radujković, M. ; Bevanda, L. Risk estimation in the process of construction project calculation // Book of abstracts and congress programme ; 5th world congress on cost engineering, Project management & quantity surveying. Ljubljana, 2006. str. ORM-09 1-9-x

Podaci o odgovornosti

Radujković, M. ; Bevanda, L.

engleski

Risk estimation in the process of construction project calculation

The paper deals with one of the possible methods of “ procedural” construction calculation and with the risk assessment in cost calculation of construction works projects. Project cost is being divided “ procedurally” according to their sensitivities to risk impact. Samples and cost groups from the division of their own relative components in the total project cost. We pre-suppose the possibility of determining the probability division of an individual risk impact on the alteration of an individual component of a project cost. Each cost component is matched by a division of relative deviations caused by an individual risk. The sensitivities of a cost component and of a total cost of construction project to an individual and all risk is analyzed by simulation of individual components in total project cost and I their corresponding to individual risk impacts. We get a population of accidental project cost with risk impact by a simulation. A cumulative frequency of total construction project cost with the calculated risk impact is going to enable the estimation of the final project cost, i.e. the cost component needed for a risk covering.

Business systems; Mesurable goals; Balanced scorecard; Project scorecard

nije evidentirano

nije evidentirano

nije evidentirano

nije evidentirano

nije evidentirano

nije evidentirano

Podaci o prilogu

ORM-09 1-9-x.

2006.

objavljeno

Podaci o matičnoj publikaciji

Book of abstracts and congress programme ; 5th world congress on cost engineering, Project management & quantity surveying

Ljubljana:

Podaci o skupu

5th world congress on cost engineering, Project management & quantity surveying, ICEC

predavanje

23.04.2006-26.04.2006

Ljubljana, Slovenija

Povezanost rada

Građevinarstvo