Nalazite se na CroRIS probnoj okolini. Ovdje evidentirani podaci neće biti pohranjeni u Informacijskom sustavu znanosti RH. Ako je ovo greška, CroRIS produkcijskoj okolini moguće je pristupi putem poveznice www.croris.hr
izvor podataka: crosbi

Example of Undervoltage Load Shedding Implementation (CROSBI ID 530311)

Prilog sa skupa u zborniku | izvorni znanstveni rad | međunarodna recenzija

Klarić, Mario ; Kuzle, Igor ; Tešnjak, Sejid Example of Undervoltage Load Shedding Implementation // Proceeding of Africon '07 / Singha, S. (ur.). Windhoek: Institute of Electrical and Electronics Engineers (IEEE), 2007. str. S26.1-S26.5

Podaci o odgovornosti

Klarić, Mario ; Kuzle, Igor ; Tešnjak, Sejid

engleski

Example of Undervoltage Load Shedding Implementation

After deregulation of power systems, large problems with voltage stability incurred due to the large transits of power transmitted to large distances. Systems are very stressed and often work on their limits. Therefore, single contingency is sometimes enough to cause system collapsing. One of the most economic methods to prevent larger scale voltage collapse is undervoltage load shedding (UVLS). In this article, implementation of UVLS scheme is tested in New England Test System and then modeled in part of Croatian power system. Simulation of system behavior is presented as well.

undervoltage load shedding; voltage; voltage; stability; simulation

nije evidentirano

nije evidentirano

nije evidentirano

nije evidentirano

nije evidentirano

nije evidentirano

Podaci o prilogu

S26.1-S26.5.

2007.

objavljeno

Podaci o matičnoj publikaciji

Proceeding of Africon '07

Singha, S.

Windhoek: Institute of Electrical and Electronics Engineers (IEEE)

Podaci o skupu

Africon 2007

predavanje

26.09.2007-28.09.2007

Windhoek, Namibija

Povezanost rada

Elektrotehnika