Grid integration of wind power plants in congested line (CROSBI ID 553653)
Prilog sa skupa u zborniku | izvorni znanstveni rad | međunarodna recenzija
Podaci o odgovornosti
Klarić, Mario ; Kuzle, Igor
engleski
Grid integration of wind power plants in congested line
Wind power projects in Croatia are in commencement but are also being demanded on a larger scale in the recent few years. However, Croatian Transmission System Operator (TSO) has many problems with the quantity of capacity asked for grid connection resulting in many places with large scale line congestion, especially in 110 kV network. In many places grid is not ready for such big penetration of intermittent power which was proven with many load flow analysis carried by system operator. In this paper one example of two different developers asking for grid connection on the same 110 kV line is presented. Also, current and future states of network are analyzed. Main problems are detected and measures for grid integration of both wind power plants are suggested.
line congestion; load flow; grid integration; system operator; wind power
nije evidentirano
nije evidentirano
nije evidentirano
nije evidentirano
nije evidentirano
nije evidentirano
Podaci o prilogu
611-616.
2009.
objavljeno
Podaci o matičnoj publikaciji
Proceedings of the International IEEE Conference EUROCON 2009
Mikerov, Alexander
Piscataway (NJ): Institute of Electrical and Electronics Engineers (IEEE)
978-1-4244-3861-7
Podaci o skupu
International IEEE Conference EUROCON 2009
predavanje
18.05.2009-23.05.2009
Sankt Peterburg, Ruska Federacija