Nalazite se na CroRIS probnoj okolini. Ovdje evidentirani podaci neće biti pohranjeni u Informacijskom sustavu znanosti RH. Ako je ovo greška, CroRIS produkcijskoj okolini moguće je pristupi putem poveznice www.croris.hr
izvor podataka: crosbi

Optimal grid integration of wind power plants in Croatian 110 kV network (CROSBI ID 553667)

Prilog sa skupa u zborniku | izvorni znanstveni rad | međunarodna recenzija

Klarić, Mario ; Kuzle, Igor Optimal grid integration of wind power plants in Croatian 110 kV network // IEEE Bucharest PowerTech 2009 : Proceedings / Eremia, Mircea (ur.). Bukurešt: Institute of Electrical and Electronics Engineers (IEEE), 2009. str. 1-6

Podaci o odgovornosti

Klarić, Mario ; Kuzle, Igor

engleski

Optimal grid integration of wind power plants in Croatian 110 kV network

Wind power projects in Croatia are demanded on a larger scale in the recent few years. However, Croatian Transmission System Operator (TSO) has many problems with the quantity of capacity asked for grid connection resulting in many places with large scale line congestion. Transmission network is not ready for such big penetration of real power with stochastic nature produced by a large number of wind power units which was proven with many load flow analysis carried by system operator. In this paper one example of two different developers asking for grid connection on the same 110 kV line is presented. Also, current and future states of network are analyzed. Main problems are detected and measures for grid integration of both wind power plants are suggested.

line congestion; load flow; grid integration; system operator; wind power

nije evidentirano

nije evidentirano

nije evidentirano

nije evidentirano

nije evidentirano

nije evidentirano

Podaci o prilogu

1-6.

2009.

objavljeno

Podaci o matičnoj publikaciji

IEEE Bucharest PowerTech 2009 : Proceedings

Eremia, Mircea

Bukurešt: Institute of Electrical and Electronics Engineers (IEEE)

978-1-4244-2235-7

Podaci o skupu

PowerTech 2009

predavanje

28.06.2009-02.07.2009

Bukurešt, Rumunjska

Povezanost rada

Elektrotehnika