The influence of the operation of hydroelectric power plants on the organization of flow measurements in the case of river Drava in Croatia (CROSBI ID 464192)
Prilog sa skupa u zborniku | izvorni znanstveni rad
Podaci o odgovornosti
Beraković, Marija ; Beraković, Boris ; Ksenija Cesarec
engleski
The influence of the operation of hydroelectric power plants on the organization of flow measurements in the case of river Drava in Croatia
By the construction of the hydroelectric power plants (HEPP) on the Drava river the regime of flow downstream from the last HEPP has been changed at flows lower than the design flow. The unsteady regime of flow as a consequence of the exploitation of the last HEPP has regular changes of water level rise and fall which affects the flow measurements. In the paper are given the time sequence of construction of HEPP on the river Drava, the consequences of that construction on flows downstream of the Mura confluence, its influence on the water balance and a suggestion for the improvement of flow measurement under artificial unsteady conditions and at flows under 15% duration.
hydroelectric power plants; flow measurements; flow regime; water balance; artificial unsteady conditions
nije evidentirano
nije evidentirano
nije evidentirano
nije evidentirano
nije evidentirano
nije evidentirano
Podaci o prilogu
C 71 - C 77-x.
1996.
objavljeno
Podaci o matičnoj publikaciji
O. Univ.-Prof. Dipl.-Ing. Dr.techn. Dr.h.c. Heinz Bergmann
Graz: Instituts für Hydromechanik Hydraulic und Hydrologie, Technisch
Podaci o skupu
XVIII Konferenz der Donauländer über Hydrologische Vorhersagen und Hydroloisch-Wasserwirtschaftliche Grundlagen
predavanje
26.08.1996-30.08.1996
Graz, Austrija