Foundation of the Viaduct Kotezi (CROSBI ID 560500)
Prilog sa skupa u zborniku | stručni rad | domaća recenzija
Podaci o odgovornosti
Bolanča, Krešimir ; Novosel, Tomislav
engleski
Foundation of the Viaduct Kotezi
Viaduct "Kotezi" is designed over the polje Bunina, on the highway A1, Zagreb – Split –Dubrovnik, section: Ravča – Vrgorac – Ploče 1 (Karamatići), from the chainage km 83+652.9 to km 84+867. Span complex consists of 32 spans with lengths 37.10 + 30 x 38.00 + 37.10 = 1214.20 m. The height from the base of the highest pillar foundation to the elevation of the grade line is 36.0 m. In this paper the methodology of the investigations, the investigation results and rough copy of the viaduct foundation is described, as well as the real engineering geological conditions on the site of every foundation, which were determined after the excavation. The comparison between the prognostic and the real cover thickness is presented, as well as the way of building the substitution layer of the crushed stone.
Viaduct Kotezi; foundation; prognostic and real model
nije evidentirano
nije evidentirano
nije evidentirano
nije evidentirano
nije evidentirano
nije evidentirano
Podaci o prilogu
763-766.
2010.
objavljeno
Podaci o matičnoj publikaciji
Vrkljan, Ivan
London : Delhi: Taylor & Francis
978-0-415-80481-3
Podaci o skupu
Nepoznat skup
poster
29.02.1904-29.02.2096