Nalazite se na CroRIS probnoj okolini. Ovdje evidentirani podaci neće biti pohranjeni u Informacijskom sustavu znanosti RH. Ako je ovo greška, CroRIS produkcijskoj okolini moguće je pristupi putem poveznice www.croris.hr
izvor podataka: crosbi

The Iterative multiobjective method in optimization process planning (CROSBI ID 162249)

Prilog u časopisu | prethodno priopćenje

Ćosić, Predrag ; Lisjak, Dragutin ; Antolić, Dražen The Iterative multiobjective method in optimization process planning // Tehnički vjesnik : znanstveno-stručni časopis tehničkih fakulteta Sveučilišta u Osijeku, 17 (2010), 1; 75-81

Podaci o odgovornosti

Ćosić, Predrag ; Lisjak, Dragutin ; Antolić, Dražen

engleski

The Iterative multiobjective method in optimization process planning

Estimation of production time, delivery term, production costs etc., are some of the key problems of unit production. In the previous research strong correlation was discovered between the features of the product drawing and production time, which has resulted with 8 regression equations. They were realized using stepwise multiple linear regression. Since the optimization of these regression equations did not fully define the most frequent requirements, multiobjective optimization was applied. The applied criteria included: minimum production time, maximum work costs/total costs ratio for a group of workpieces. The group was created using specific classifiers that defined similar workpieces. A STEP model with seven decision variables within a group was applied, and the groups with a high index of determination were selected. Independent values that maximize the work costs/total costs ratio and minimize production times were determined. The obtained regression equations of time production parts and work costs/total costs ratio are included in the objective functions to reduce production time and increasing, work costs/total costs at the same time. The values of decision variables that minimize production time and maximize work costs/total costs ratio were determined. As the solution of the described problem, multicriteria interactive STEP method was applied.

production time; regression analysis; multiobjective method for optimization

nije evidentirano

nije evidentirano

nije evidentirano

nije evidentirano

nije evidentirano

nije evidentirano

Podaci o izdanju

17 (1)

2010.

75-81

objavljeno

1330-3651

Povezanost rada

Strojarstvo

Poveznice
Indeksiranost