Nalazite se na CroRIS probnoj okolini. Ovdje evidentirani podaci neće biti pohranjeni u Informacijskom sustavu znanosti RH. Ako je ovo greška, CroRIS produkcijskoj okolini moguće je pristupi putem poveznice www.croris.hr
izvor podataka: crosbi

Using Multicriteria Optimization in Process Planning (CROSBI ID 564097)

Prilog sa skupa u zborniku | izvorni znanstveni rad | međunarodna recenzija

Ćosić, Predrag ; Lisjak, Dragutin ; Antolić, Dražen Using Multicriteria Optimization in Process Planning // 3rd International Conference for Entrepreneurship, Innovation and Regional Development (ICEIRD2010) : proceedings / Zoran, Anišić (ur.). Novi Sad: Faculty of technical sciences, Department for Industrial Engineering and Management, UNESCO Chair in Entrepreneurial Studies & CISCO Entrepreneur Institute, Training Centre Serbia,, 2010. str. 140-147

Podaci o odgovornosti

Ćosić, Predrag ; Lisjak, Dragutin ; Antolić, Dražen

engleski

Using Multicriteria Optimization in Process Planning

Estimation of production time, delivery term, production costs etc., are some of the key problems of unit production. In the previous research strong correlation was discovered between the features of the product drawing and production time, which has resulted with 8 regression equations. They were realized using stepwise multiple linear regression. Since the optimization of these regression equations did not fully define the most frequent requirements, multicriteria optimization was applied. The applied criteria included: minimum production time, maximum work costs/total costs ratio for a group of workpieces. The group was created using specific classifiers that defined similar workpieces. A STEP model with seven decision variables within a group was applied, and the groups with a high index of determination were selected. Independent values that maximize the work costs/total costs ratio and minimize production times were determined. The obtained regression equations of time production parts and work costs/total costs ratio are included in the objective functions to reduce production time and increasing, work costs/total costs at the same time. The values of decision variables that minimize production time and maximize work costs/total costs ratio were determined. As the solution of the described problem, multicriteria interactive STEP method was applied.

multicriteria optimization; STEP method; process planning

nije evidentirano

nije evidentirano

nije evidentirano

nije evidentirano

nije evidentirano

nije evidentirano

Podaci o prilogu

140-147.

2010.

objavljeno

Podaci o matičnoj publikaciji

3rd International Conference for Entrepreneurship, Innovation and Regional Development (ICEIRD2010) : proceedings

Zoran, Anišić

Novi Sad: Faculty of technical sciences, Department for Industrial Engineering and Management, UNESCO Chair in Entrepreneurial Studies & CISCO Entrepreneur Institute, Training Centre Serbia,

978-86-7892-250-3

Podaci o skupu

International Conference for Entrepreneurship, Innovation and Regional Development (3 ; 2010)

predavanje

27.05.2010-29.05.2010

Novi Sad, Srbija

Povezanost rada

Strojarstvo