Methodology for Ranking of the NPP Krško PSR Issues (CROSBI ID 570333)
Prilog sa skupa u zborniku | stručni rad | međunarodna recenzija
Podaci o odgovornosti
Bašić, Ivica ; Vrbanić, Ivan ; Antolovič, Aleksandra
engleski
Methodology for Ranking of the NPP Krško PSR Issues
A Periodic Safety Review (PSR) of a nuclear power plant, typically, results with a number of identified issues of different types. According to the current IAEA’s referential PSR guiding document, the overall review is divided into fifteen review areas, termed “safety factors”, which range from “plant design” to “human factors” to ”safety culture”, for example. The method for ranking of identified safety issues must characterize the safety importance of the issues coming from different review areas or factors on the same scale and consistent basis. For the Krsko NPP’s (NEK) second PSR, the method for issue ranking was established which primarily evaluates the safety significance of any PSR issue by considering its impact on the defense in depth. This impact can be evaluated qualitatively or quantitatively. The paper presents the methodology and illustrates its application on a selected simple example.
NPP Krško; PSR
nije evidentirano
nije evidentirano
nije evidentirano
nije evidentirano
nije evidentirano
nije evidentirano
Podaci o prilogu
S6-59.1-S6-59.11.
2010.
objavljeno
Podaci o matičnoj publikaciji
Proceedings of the 8th International Conference on Nuclear Option in Countries with Small and Medium Electricity Grids
Pevec, Dubravko ; Subašić, Damir ; Šimić, Zdenko
Zagreb: Hrvatsko nuklearno društvo
978-953-55224-2-3
Podaci o skupu
8th International Conference on Nuclear Option in Countries with Small and Medium Electricity Grids
poster
16.05.2010-20.05.2010
Dubrovnik, Hrvatska