Application of Snapback Chronometry Method in Calculation of Regulation (CROSBI ID 173862)
Prilog u časopisu | izvorni znanstveni rad
Podaci o odgovornosti
Marović, Ivan ; Žic, Elvis ; Jajac, Nikša
engleski
Application of Snapback Chronometry Method in Calculation of Regulation
Work study is an area of construction production rationalization in which with scientific, logical, holistic and system analysis methods of the process we gain optimum in way of work and time of work. Chronometry method is one of the work study methods which is appropriate for recording shorter cyclic processes and is based on statistical sampling theory. Determination of cyclic times and work performances of standard cyclic construction machines (SCCM) is one of key assumptions of dynamic planning of machine work on every construction site. Calculation methods of SCCM work performances are one of basic research objects in the field of construction organization and technology. Study shows applied chronometry method in work of standard cyclic construction machine. Goal of this study is to accomplish regulation through measured time cycle and compare measured effects with effects obtained with standard methodology of calculating hydraulic excavator practical achievement for gaining regulation in order to determine main reasons which effect work performance on site.
work study ; work performance ; snapback chronometry method ; standard cyclic construction machine (SCCM) ; regulation
nije evidentirano
nije evidentirano
nije evidentirano
nije evidentirano
nije evidentirano
nije evidentirano
Podaci o izdanju
5 (3)
2011.
273-277
objavljeno
1934-7359
10.17265/1934-7359/2011.03.009