Analysis of different phased construction models for two-tube tunnels on motorways (CROSBI ID 594548)
Prilog sa skupa u časopisu | izvorni znanstveni rad | međunarodna recenzija
Podaci o odgovornosti
Mustapić, Ivan ; Tkalčić, Damir ; Puž, Goran
engleski
Analysis of different phased construction models for two-tube tunnels on motorways
This paper presents a comparative analysis of four phased construction models for two-tube tunnels on motorways, using information gained during construction of different tunnels on Croatian motorways. They all have the same cross-section, all were built using the “drill & blast technique”, all are based on the NATM and all were in similar rock conditions. Main comparative parameters, to be used in the comparative analysis are: costs, safety, traffic volume, technology, regulations, risks, construction progress... The paper aims to find the optimal construction model for two-tube tunnels on motorways, from the aspects of above mentioned comparative parameters.
phase construction; tunnel
nije evidentirano
nije evidentirano
nije evidentirano
nije evidentirano
nije evidentirano
nije evidentirano
Podaci o prilogu
1695-1702.
2011.
nije evidentirano
objavljeno
Podaci o matičnoj publikaciji
RIL. Suomen rakennusinsinöörien liitto
Sarkka, Pekka
Helsinki: ITA-AITES
978-951-758-531-6
0356-9403
Podaci o skupu
World Tunnel Congress 2011
predavanje
20.05.2011-26.05.2011
Helsinki, Finska