Nalazite se na CroRIS probnoj okolini. Ovdje evidentirani podaci neće biti pohranjeni u Informacijskom sustavu znanosti RH. Ako je ovo greška, CroRIS produkcijskoj okolini moguće je pristupi putem poveznice www.croris.hr
izvor podataka: crosbi

Balance of nature and engineering requirements on existing arch bridges (CROSBI ID 632545)

Prilog sa skupa u zborniku | izvorni znanstveni rad | međunarodna recenzija

Mandić Ivanković, Ana ; Gleđ, Niko ; Franetović, Marin Balance of nature and engineering requirements on existing arch bridges // IABSE Symposium Madrid 2014: Engineering for Progress, Nature and People. 2014

Podaci o odgovornosti

Mandić Ivanković, Ana ; Gleđ, Niko ; Franetović, Marin

engleski

Balance of nature and engineering requirements on existing arch bridges

In order to sustain the equilibrium between the nature and requirements on structures based on contemporary standards, research on development of assessment procedures for existing arch bridges exposed to wind load and located in seismic active areas is developing through last few years in Croatia as a part of an extensive project to develop their appropriate maintenance strategy. In this paper an overview of assessment results for Adriatic arch bridges with spans ranging from 200 m to almost 400 m will be presented. More detailed assessment of the Krk Bridge spanning 244 m and exposed to severe wind load will be presented.

existing bridges; wind load; linear and nonlinear methods; reliability analysis.

nije evidentirano

nije evidentirano

nije evidentirano

nije evidentirano

nije evidentirano

nije evidentirano

Podaci o prilogu

2014.

nije evidentirano

objavljeno

Podaci o matičnoj publikaciji

IABSE Symposium Madrid 2014: Engineering for Progress, Nature and People

Podaci o skupu

37th IABSE Symposium Madrid 2014 Engineering for Progress, Nature and People

predavanje

03.09.2014-05.09.2014

Madrid, Španjolska

Povezanost rada

Građevinarstvo