Analysis of Environmental Conditions for NPP Krško DC Battery and Battery Charger Rooms Following SG Blowdown Processing System Line Break (CROSBI ID 486171)
Prilog sa skupa u zborniku | izvorni znanstveni rad | međunarodna recenzija
Podaci o odgovornosti
Grgić, Davor ; Špalj, Srđan ; Fancev, Tomislav
engleski
Analysis of Environmental Conditions for NPP Krško DC Battery and Battery Charger Rooms Following SG Blowdown Processing System Line Break
This paper describes analysis of thermal-hydraulic conditions in NEK DC Battery and Battery Charger rooms after a postulated break of the SG Blowdown Processing System (SGBD) line. Such break can result in release of the SG water in NEK Intermediate Building which can endanger the safety related electrical equipment. In order to take into account all possibilities, the presence of HVAC (heating, ventilation and air conditioning) ducts must be taken into account, i.e., the HVAC duct can potentially be damaged under the pressure conditions in the rooms where the SGBD break occurs leaving the free path to the DC Battery and Battery Charger rooms.
Nuclear power plant; Equipment qualification; SG blowdown break
nije evidentirano
nije evidentirano
nije evidentirano
nije evidentirano
nije evidentirano
nije evidentirano
Podaci o prilogu
2002.
objavljeno
Podaci o matičnoj publikaciji
Proceedings of the 4th International Conference on Nuclear Option in Countries with Small and Medium Electricity Grids
Podaci o skupu
4th International Conference on Nuclear Option in Countries with Small and Medium Electricity Grids
poster
16.06.2002-20.06.2002
Dubrovnik, Hrvatska