Some Insights Gained from On-Line Risk Monitoring of the Complete Plant Operating Cycle (CROSBI ID 486527)

Prilog sa skupa u zborniku | izvorni znanstveni rad

Šimić, Zdenko ; Mikuličić, Vladimir ; Vrbanić, Ivan Some Insights Gained from On-Line Risk Monitoring of the Complete Plant Operating Cycle // Technical Comittee Meeting on "Risk Informed Decision Making" / Ranguelova, Vasselina; Drouin, Mary (ur.). Beč: International Atomic Energy Agency (IAEA), 2001

Podaci o odgovornosti

Šimić, Zdenko ; Mikuličić, Vladimir ; Vrbanić, Ivan

engleski

Some Insights Gained from On-Line Risk Monitoring of the Complete Plant Operating Cycle

This paper is presenting numerical comparison between Probabilistic Risk As-sessment (PRA) results for the so-called average model and for the realistic model. From the one side average PRA model is regularly used model, which is modeling average behavior of the all-modeling parameters during one-year period. On the other side realistic PRA model is considering various plant configurations and other im-portant conditions that are changing during one-year period. Results are obtained for the specific modeling segment related to the plant safety power supply. Diesel gen-erators are regularly maintained during the year, and probability for initiating event loss of offsite power (LOOP) is changing depending on the power grid state and weather conditions. Influences of these two facts are quantified and result presented. Two different PRA models with two different levels of details were used. Both results are showing that core damage probability (CDP) varies in the range of 10% because some activities are rescheduled (i.e., DG is maintained or not during the highest LOOP likelihood). Results are also clearly indicating that extreme instantaneous CD fre-quencies are avoided with better activities schedule. This also results in CDP reduction. Potential for risk reduction is significant when results from on-line risk monitoring of the complete plant operating cycle is considered.

probabilistic safety assessment; risk; nuclear power plant; plant configuration

nije evidentirano

nije evidentirano

nije evidentirano

nije evidentirano

nije evidentirano

nije evidentirano

Podaci o prilogu

2001.

objavljeno

Podaci o matičnoj publikaciji

Technical Comittee Meeting on "Risk Informed Decision Making"

Ranguelova, Vasselina; Drouin, Mary

Beč: International Atomic Energy Agency (IAEA)

Podaci o skupu

Risk Informed Decision Making

predavanje

05.11.2001-09.11.2001

Sjedinjene Američke Države

Povezanost rada

Elektrotehnika