Nalazite se na CroRIS probnoj okolini. Ovdje evidentirani podaci neće biti pohranjeni u Informacijskom sustavu znanosti RH. Ako je ovo greška, CroRIS produkcijskoj okolini moguće je pristupi putem poveznice www.croris.hr
izvor podataka: crosbi

Dating of Old bridge in Mostar (CROSBI ID 497587)

Prilog sa skupa u zborniku | sažetak izlaganja sa skupa | međunarodna recenzija

Obelić, Bogomil ; Peković, Željko ; Barešić, Jadranka ; Krajcar Bronić, Ines ; Milošević, Ante Dating of Old bridge in Mostar // Berichte des Institutes fuer Erdwissenschaften Karl-Franzens-Universitaet Graz, ISSN 1608-8166, bd. 8, isotope workshop Volume. Graz, 2004. str. 106-107-x

Podaci o odgovornosti

Obelić, Bogomil ; Peković, Željko ; Barešić, Jadranka ; Krajcar Bronić, Ines ; Milošević, Ante

engleski

Dating of Old bridge in Mostar

The famous arch bridge in Mostar, Bosnia and Herzegovina, was built in 1557-1566 by order of sultan Süleyman the Magnificent. This single-arch stone bridge was constructed by Turkish architect Mimar Hayruddin at the place of an older wooden construction and was 19 m high, with the span of 28.7 m. The bridge was destroyed in war 1993, and has been reconstructed during last several years. During the reconstruction of the Old Bridge, the remnants of two older bridges were found - a wooden construction that preceded the stony bridge, and an even older wooden suspended bridge. According to documents, mainly from the Dubrovnik Archives, the first suspended bridge crossed the Neretva River by the beginning of the 14th century, while the following wooden bridge was built during the campaign against Turks of the Croato-Hungarian king Matthias Corvinus in 1466, probably by the Ragusian architect Paskoje Miličević. Eight wood or charcoal samples from various periods of construction of the bridge were dated by the 14C method, and were given for dendrochronological analysis. The oldest beam used in construction of the first pre-Turkish suspended bridge has been dated to 11th century by both methods. Two other beams taken from the uncovered construction of the suspended bridge, as well as two charcoal samples from the basement of the Tara tower on the left bank of the Neretva River, are dated to 14th century. The beam associated with the second wooden bridge is dated to the second half of the 15th century, and the beams connected with the reconstruction of Hayruddin's stony to 18th century. Good agreement between the calibrated 14C and dendrochronological ages is obtained.

radiocarbon dating; Mostar; Old bridge

nije evidentirano

nije evidentirano

nije evidentirano

nije evidentirano

nije evidentirano

nije evidentirano

Podaci o prilogu

106-107-x.

2004.

objavljeno

Podaci o matičnoj publikaciji

Berichte des Institutes fuer Erdwissenschaften Karl-Franzens-Universitaet Graz, ISSN 1608-8166, bd. 8, isotope workshop Volume

Graz:

Podaci o skupu

ESIR VII, European society foe Isotope Research Workshop

poster

27.06.2004-01.07.2004

Seggauberg, Austrija

Povezanost rada

Fizika