Nalazite se na CroRIS probnoj okolini. Ovdje evidentirani podaci neće biti pohranjeni u Informacijskom sustavu znanosti RH. Ako je ovo greška, CroRIS produkcijskoj okolini moguće je pristupi putem poveznice www.croris.hr
izvor podataka: crosbi !

Cost Minimisation for Total Site Heat Recovery (CROSBI ID 222039)

Prilog u časopisu | izvorni znanstveni rad

Boldyryev, Stanislav ; Krajačić, Goran ; Duić, Neven ; Varbanov, Petar, Sabev Cost Minimisation for Total Site Heat Recovery // Chemical engineering transactions, 45 (2015), 157-162. doi: 10.3303/CET1545027

Podaci o odgovornosti

Boldyryev, Stanislav ; Krajačić, Goran ; Duić, Neven ; Varbanov, Petar, Sabev

engleski

Cost Minimisation for Total Site Heat Recovery

In this paper minimisation of total cost for retrofit of Total Site heat recovery system is proposed. It based on analysis of balanced Total Site Profiles and includes procedure for calculation of heat transfer area. Heat transfer area is calculated for different regions with use of intermediate utility and direct heating and cooling. Minimal temperature difference between Total Site Profiles is analysed. Global minimum of heat transfer area for Total Site recovery is calculated for array of minimal temperature differences. It is analysed with utility consumption, numbers of units and material of equipment. Selection of minimum total cost for retrofit project of site recovery system is proposed.

Total Site Analysis; Process Integration; Energy Efficiency; Heat Recovery

nije evidentirano

nije evidentirano

nije evidentirano

nije evidentirano

nije evidentirano

nije evidentirano

Podaci o izdanju

45

2015.

157-162

objavljeno

1974-9791

2283-9216

10.3303/CET1545027

Povezanost rada

Kemijsko inženjerstvo, Strojarstvo

Poveznice